Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Towards Smart Zero CO2 Cities across Europe (SmartEnCity)

Start date: Feb 1, 2016, End date: Jul 31, 2021,

SmartEnCity’s main Objective is to develop a highly adaptable and replicable systemic approach towards urban transformation into sustainable, smart and resource-efficient urban environments in Europe through the integrated planning and implementation of measures aimed at improving energy efficiency in main consuming sectors in cities, while increasing their supply of renewable energy, and demonstr ...
Read Project

 35

 FINISHED 
Background The Mediterranean ribbed limpet (Patella ferruginea) is endemic to the western Mediterranean Sea. Since the middle of the 20th Century, the range of the species has undergone a marked decline. Consequently, the species is included in Annex II of the SPAMI Convention, Appendix 2 of the Bern Convention, and in Annex IV of the EU Habitats Directiv ...
Read Project

 3

 FINISHED 
Environmental heating is a growing challenge for our community and problems are already experienced by millions of Europeans during the summertime and aggravated during heat waves or occupational settings. In addition to the well-known health risks related to severe heat stress, a number of studies have confirmed significant loss of productivity due to hyperthermia. Even if countries adopt the EU ...
Read Project

 21

 FINISHED 
Based on a detailed mapping of urban challenges and relevant nature-based solutions (NBS), Nature4Cities aims at developing complementary and interactive modules to engage urban stakeholders in a collective-learning process about re-naturing cities, develop and circulate new business, financial and governance models for NBS projects, as well as provide tools for the impacts assessment, valorisatio ...
Read Project

 26

 FINISHED 
4RinEU will define robust, cost-effective, tailorable deep renovation technology packages supported by usable methodologies, feeding into reliable business models. The project will minimize failures in design and implementation, manage different stages of the deep renovation process, from the preliminary audit up to the end-of-life, and provide information on energy, comfort, users’ impact, and in ...
Read Project

 13

 FINISHED 
Around 461 million ton/year of C&DW are generated in EU28. Recent studies on the characterization of C&DW samples at European level revealed a predominant fraction of concrete (52% average). Over the last years, novel technology has been developed aiming to guarantee high quality recycled concrete aggregates for use in new concrete, thereby closing the concrete loop. The most advanced concrete re ...
Read Project

 15

 FINISHED 
NewSOL proposal addresses the specific challenge towards high efficiency solar energy harvesting by advance materials solutions and architectures that are in line with those specified in SET-plan. Its main objective is to develop advance materials solutions based on innovative storage media and concepts for Concentrated Solar Power (CSP) up to validation in field of their performance by real time ...
Read Project

 14

 FINISHED 
The proposal addresses novel concepts for introducing Robotics and Autonomous Systems in the Construction Sector where, at this moment, the presence is minor. Specifically, the Hephaestus project focuses on highly risked and critical construction tasks such as prefab wall installation. In that sense, the Hephaestus has been conceived as a solution for accomplishing multiple tasks on vertical or in ...
Read Project

 9

 FINISHED 
In the “secure, clean and efficient energy” initiative, it is stated that the most important milestones for such a transformation are the EU's energy and climate targets for 2030, which are: (i) at least 40% reduction in greenhouse gas emissions compared to 1990, (ii) at least 27% for the share of renewable energy consumed in the EU, and (iii) at least 27% improvement of energy efficiency and an e ...
Read Project

 13

 FINISHED 
The main goal of the LORCENIS project is to develop long reinforced concrete for energy infrastructures with lifetime extended up to a 100% under extreme operating conditions. The concept is based on an optimal combination of novel technologies involving customized methodologies for cost-efficient operation. 4 scenarios of severe operating conditions are considered:1. Concrete infrastructure in d ...
Read Project

 17

 FINISHED 
The Green INSTRUCT project will develop a prefabricated modular structural building block that is superior to conventional precast reinforced concrete panels by virtue of its reduced weight, improved acoustic and thermal performance and multiple functionalities. The Green INSTRUCT block consists of over 70% of CDW in weight. The Green INSTRUCT project will: (i) achieve sustainability and cost sav ...
Read Project

 15

 FINISHED 
The overall goal of the RE4-Project is to promote new technological solutions for the design and development of structural and non-structural pre-fabricated elements with high degree of recycled materials and reused structures from partial or total demolition of buildings. The developed technology will aim at energy efficient new construction and refurbishment, thus minimizing environmental impact ...
Read Project

 14

 FINISHED 
The overall objective of FISSAC project is to develop and demonstrate a new paradigm built on an innovative industrial symbiosis model towards a zero waste approach in the resource intensive industries of the construction value chain, tackling harmonized technological and non technological requirements, leading to material closed-loop processes and moving to a circular economy.A methodology and a ...
Read Project

 26

 FINISHED 
REMOURBAN aims at the development and validation in three lighthouse cities (Valladolid-Spain, Nottingham-UK and Tepebasi/Eskisehir-Turkey) of a sustainable urban regeneration model that leverages the convergence area of the energy, mobility and ICT sectors in order to accelerate the deployment of innovative technologies, organisational and economic solutions to significantly increase resource and ...
Read Project

 22

 FINISHED 
Offshore wind business competitiveness is strongly related to substructures and offshore logistics. DEMOGRAVI3 addresses these areas through a very promising solution called GRAVI3.GRAVI3 is an innovative hybrid steel-concrete offshore sub-structure for transitional water depths between 35 and 60m. It will sustainably reduce the levelized cost of energy by up to 15% by combining the following vect ...
Read Project

 11

 FINISHED 
KRAKEN will develop a disruptive hybrid manufacturing concept to equip SME and large industries with affordable All-in-one machine for the customised design, production/reparation and quality control of functional parts (made in aluminium, thermoset or both materials combined from 0,1m till 20m) through subtractive and novel additive technologies in vast working areas without floor space requireme ...
Read Project

 15

 FINISHED 
An efficient asset management process is needed to ensure cost-effectiveness, in planning, delivery, operation and maintenance of large infrastructures or infrastructures network. Infrastructure asset management generally focuses on the later stages of a facility’s life cycle, specifically maintenance, rehabilitation, and replacement. However, a process of efficient asset management must define me ...
Read Project

 14

 FINISHED 
Heating consumption in the residential sector in Europe is around 2300 TWh/y, DHW consumptions reaches 500 TWh/y, while cooling consumption is less than 100 TWh/y. The construction sector offers unique opportunities to decarbonise the European economy. However, as the replacement rate of the existing stock is very small (1-1.5 % per year), acceleration is needed.On top of this, the reorganisation ...
Read Project

 18

 FINISHED 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Read Project

 22

 FINISHED 
The overall objective of BRESAER project is to design, develop and demonstrate an innovative, cost-effective, adaptable and industrialized envelope system for buildings refurbishment including combined active and passive pre-fabricated solutions integrated in a versatile lightweight structural mesh:‒ Dynamic window with automatic and controlled air-tightness and insulated solar blinds complementin ...
Read Project

 17

 FINISHED 
Background There are around 3 000 active foundry operations in Europe that annually generate over 9 million tonnes of waste sand, with ferrous industries the major generators. Only 25% of this Spent Foundry Sand (SFS) is recycled for a few applications, mainly by the cement industry, but these sectors are unable to absorb the total amount of sand generate ...
Read Project

 5

 FINISHED 
Building-integrated photovoltaics (BIPV) is currently an expansive market. Market analysts estimate a compound annual growth rate of 18,7% and a total of 5,4 GW installed worldwide between 2013 and 2019. One of the main drivers for BIPV market growth in the EU is the increasingly demanding legislation related to energy performance in buildings. The large potential for energy savings in buildings l ...
Read Project

 15

 FINISHED 
The overall objective of the ALION project is to develop aluminium-ion battery technology for energy storage application indecentralised electricity generation sources. ALION pursues an integral approach comprising electroactive materials based on “rocking chair” mechanism, robust ionic liquid-based electrolytes as well as novel cell and battery concepts, finally resulting in a technology with muc ...
Read Project

 13

 FINISHED 
The Oil&Gas (O&G) industry is one of the 8 most water-intensive industries; indeed, it could be conceived as a water industry which delivers oil as a by-product. Specifically, by 2020 it is expected that over 500 million barrels/day of produced water (PW) and about 15 million m³/day of refinery wastewater (RW) are generated. Despite the necessity and potential beneficial impacts of reusing the wat ...
Read Project

 10

 FINISHED 
"CITyFiED project aims to develop a replicable, systemic and integrated strategy to adapt European cities and urban ecosystems into the smart city of the future, focusing on reducing the energy demand and GHG emissions and increasing the use of renewable energy sources by developing and implementing innovative technologies and methodologies for building renovation, smart grid and district heating ...
Read Project

 18

 FINISHED 

Research into enhanced tracks, switches and structures (IN2TRACK)

Start date: Sep 1, 2016, End date: Feb 28, 2019,

Research into Enhanced Track, Switches and StructureThe railway of the future needs to meet the predicted growth in societal demand in terms of capacity and service, address the environmental challenges of the 21st century, and enable the political objectives of the European Union. IN2TRACK is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by del ...
Read Project

 26

 FINISHED 
OptEEmAL aims to develop an Optimised Energy Efficient Design Platform for refurbishment at district level, which will deliver an optimised, integrated and systemic design based on an Integrated Project Delivery (IPD) approach for building and district retrofitting projects, reducing time delivery and uncertainties, resulting in improved solutions when compared to business-as-usual practices. This ...
Read Project

 14

 FINISHED 
The ISOBIO project will develop a new approach to insulating materials through the novel combination of existing bio-derived aggregates with low embodied carbon with innovative binders to produce durable composite construction materials. These novel composites will target 50% lower embodied energy and carbon than traditional oil based insulation panels, and will increase thermal insulation compare ...
Read Project

 15

 FINISHED 
EU28 currently generates 461 million tons per year of ever more complex construction and demolition waste (C&DW) with average recycling rates of around 46%. There is still a significant loss of potential valuable minerals, metals and organic materials all over Europe.The main goal of HISER project is to develop and demonstrate novel cost-effective technological and non-technological holistic solut ...
Read Project

 29

 FINISHED 

Energy Efficient Optimised District Heating and Cooling (E2District)

Start date: Feb 1, 2016, End date: Jan 31, 2019,

Intelligent Energy Europe expects district heating to double its share of the European heat market by 2020 while district cooling will grow to 25%. While this expansion will translate into 2.6% reduction in the European primary energy need and 9.3% of all carbon emissions, it will not be achieved through modernization and expansion alone but requires fundamental technological innovation to make th ...
Read Project

 5

 FINISHED 
STILORMADE will validate an innovative technology platform (developed by S’Tile) for the design and manufacture of customized (non-standard) photovoltaic modules achieving >18% module efficiency with tailored mode of operation (current and voltage), >99% production reproducibility, operational thermal (environmental) stability, and mechanical flexibility; at a production cost of 50% power (efficie ...
Read Project

 5

 FINISHED 
Concrete is the most widely used man-made material on Earth, with an annual consumption of around 10 billion m³. However, its fabrication is characterized by total CO2 emissions amounting to around 5% of the worldwide anthropogenic GHG emissions. More sustainable cements with lower embodied energy and CO2 footprint are needed.As stated in the European Directive on Energy Performance of Buildings ( ...
Read Project

 14

 FINISHED 

Towards a EU framework for the security of Widezones (ZONESEC)

Start date: Dec 1, 2014, End date: Nov 30, 2018,

The advancement of 24/7 surveillance systems for the security of WideZones with multiple assets at localized scales is of extreme strategic relevance to European economies, industries, authorities and Citizens. Nevertheless, the cost for large deployments and maintenance of ground sensing networks for local surveillance across these WideZones is extremely high. Hence, large areas of high economic ...
Read Project

 19

 FINISHED 
Background Two of the main environmental problems caused by water pollution are eutrophication (excessive nutrients) and hypoxia (oxygen starvation), which result from nutrient pollution of water bodies. They promote excessive plant growth and decay, favouring certain weedy species, and cause severe reductions in water quality. The EU Water Framework Dire ...
Read Project

 2

 FINISHED 

Energy-efficient Heterogeneous COmputing at exaSCALE (ECOSCALE)

Start date: Oct 1, 2015, End date: Sep 30, 2018,

In order to reach exascale performance current HPC servers need to be improved. Simple scaling is not a feasible solution due to the increasing utility costs and power consumption limitations. Apart from improvements in implementation technology, what is needed is to refine the HPC application development as well as the architecture of the future HPC systems.ECOSCALE tackles this challenge by pro ...
Read Project

 8

 FINISHED 
Background According to a recent United Nations’ report, the percentage of appropriated water has risen by up to 30% in recent years: the consumption of water per capita increases (due to the improvement of living standards), the population grows and as a result, the amount of available water is less than the overall demand. Some regions of the Europea ...
Read Project

 2

 FINISHED 
EVENT will develop, demonstrate and validate a cost effective, high energy efficient, low CO2 emissions, replicable, low intrusive, systemic approach for retrofitting of residential and commercial buildings, able to achieve NZEB retrofit standard levels, through the integration of an innovative adaptive ventilated façade system, including: • Embedded, breakthrough smart modular heat recovery units ...
Read Project

 13

 FINISHED 
Present approaches to increasing resource efficiency in manufacturing companies are mainly focused on single process optimisation. A wider and integrated optimisation is assumed to have significantly higher savings potential.In fact, a pilot study has been performed by Greenovate!Europe, showing resource saving potentials of 70%Such a strategy should include optimisation across the interfaces betw ...
Read Project

 16

 FINISHED 

Smart and Networking UnderWAter Robots in Cooperation Meshes (SWARMs)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

Nowadays, the major part of offshore operations is done by divers in dangerous missions. Since their number is limited, the dependency on their work represents a real threat to the offshore industry. The extended use of unmanned underwater vehicles (AUVs/ROVs) could solve this problem but since they are usually tailor-made for a specific task and difficult to operate their deployment is very expen ...
Read Project

 31

 FINISHED 
District Heating and Cooling networks distribute energy from a centralized generation plant to a number of remote customers. As such, actual DHC systems suffer from• significant heat losses• highly unexplored integration potential of different available energy sources (e.g. renewables and waste heat) into the network• high installation costs.FLEXYNETS will develop, demonstrate and deploy a new gen ...
Read Project

 7