Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Weight reduction and cost savings have driven composites research towards a number of recent high profile achievements. The increased use of anisotropic AL/CFRP/Ti stacks in aircraft structures has in turn created enormous challenges for the industry due to the difficulties that arise from drilling these heterogeneous stack materials. The project “European and Chinese Platform for Stacked Aero-Str...
Read Project

 4

 FINISHED 

Big Data Value ecosystem (BDVe)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp...
Read Project

 11

 FINISHED 

Microbial life in oil (EcOILogy)

Start date: Sep 1, 2015, End date: Aug 31, 2020,

Microbial biodegradation is a key factor influencing the quality of oil and, according to current concepts, takes place mostly at the continuous oil-water transition zone in oil reservoirs. I recently discovered microorganisms in minuscule water droplets (1-3 µl) entrapped in oil from a natural oil seep. In EcOILogy, I propose that biodegradation of oil resources takes place in such minuscule wate...
Read Project

 1

 FINISHED 

Secure Data Processing in the Cloud (RESTASSURED)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Secure cloud computing is key for business success and end-user adoption of federated and decentralized cloud services and thus essential to stimulate the growth of the European Digital Single Market. RestAssured will provide solutions to specific technical concerns of data protection in the cloud (such as geo-location restrictions on personal data), which are imposed by the dynamic, multi-stakeho...
Read Project

 6

 FINISHED 
European business sector pays an ever more increasing attention to competences such as sense of initiative and entrepreneurship. The recommendation 2006/962/EC on key competences for lifelong learning highlights paramount importance of these key competences for employability. These competences related to entrepreneurship play a paramount role in EU neighbouring countries in their development proc...
Read Project

 14

 FINISHED 

Particle Reduced, Efficient Gasoline Engines (PaREGEn)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

PaREGEn addresses the short term scope of the GV-02 call via research into and the innovation of gasoline engines for light duty vehicles. Specifically, engines used in mid to premium passenger cars will be addressed. With the electrification smaller vehicles, focusing on larger cars is especially important: the need for clean, efficient & economic engines for inter-urban transport is more urgent ...
Read Project

 16

 FINISHED 

European Network of STEM Professional Development Centres

Start date: Sep 1, 2016, End date: Aug 31, 2019,

To deal with the increasingly complex reality in class, which has accelerated in the last years, teachers need support through professional development (PD) activities to adopt new integrative methods. This need is particularly pronounced in STEM teaching (Science, Technology, Engineering and Mathematics) since STEM is a field in which all pupils, including migrants or those from disadvantaged bac...
Read Project

 14

 FINISHED 

Transforming Transport (TT)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected...
Read Project

 48

 FINISHED 
Smart Grid (SG) concepts are rapidly being transferred to the market and huge investments have been made in renewable based electricity generation and rolling out smart meters. However, the present state of the art does not ensure neither a good return of investment nor a sustainable and efficient power system. The work so far in the EU involves mainly larger stakeholders, namely power utilities a...
Read Project

 6

 FINISHED 

A New Way for New Talents in Teaching

Start date: Jan 15, 2016, End date: Jan 14, 2019,

Our consortium members - 15 partners from the public, academic and non-government sectors from 7 EU countries - believe there are shared structural challenges related to the teaching profession in school systems across the EU. Unless adequately addressed, these challenges might jeopardize the achievement of the ambitious EU 2020 strategy education goals. These threats include: incipient teacher sh...
Read Project

 14

 FINISHED 
Cell migration (cell motility) is a fundamental biological process that is pivotal in (i) tissue formation and repair (health) and (ii) tissue invasion during carcinogenesis (disease). Understanding and controlling cell migration will have major clinical impact. Clarifying mechanisms driving cell motility has been challenging due to the complex underlying cellular mechanisms; these involve multipl...
Read Project

 11

 FINISHED 
The REMEDIATE ETN comprises 10 beneficiaries (from 5 EU Member States – the UK, Ireland, Germany, Denmark, and Italy) and 15 partner organisations. The beneficiaries and partner organisations are committed to the provision of innovative research and training for more cost effective and sustainable remediation of contaminated land. It is a multidisciplinary collaboration between internationally ren...
Read Project

 10

 FINISHED 
This European Training Network aims to produce the next generation of early stage researchers who will enable Europe to take a leading role in the development of future devices, systems and networks supporting the 5G high-speed wireless internet. To do this, researchers must be able to work in interdisciplinary teams, integrate their activities, share expertise, and promote a vision of a converged...
Read Project

 10

 FINISHED 

TUneable Multiferroics based on oxygen OCtahedral Structures (TUMOCS)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The main objective of the project is development of new lead-free multiferroic materialshe for prospective application in forms of films and/or arranged layers in which the cross-coupling (magnetic-dipolar-elastic) can be tuned by both internal and external factors. This objective is to be achieved through preparation, investigation, and optimization of two kinds of Bi-containing oxygen-octahedra...
Read Project

 6

 FINISHED 

Interfaces in Turbulent Premixed Flames (ITPF) (ITPF)

Start date: Dec 1, 2016, End date: Nov 30, 2018,

"This project, "Interfaces in Turbulent Premixed Flames" (ITPF), aims at improving the physical understanding of the entrainment of hot products in annular co-flows of turbulent premixed flames into jets of fresh reactants. This research will characterize the entrainment processes through the study and comparison of Turbulent/Non-Turbulent (T/NT) and scalar interfaces in turbulent premixed flames....
Read Project

 1

 FINISHED 
Methanol represents one of the most common and widespread platform chemicals and precursors for further synthesis, and is traditionally produced from synthesis gas, obtained by the reforming of natural gas. This methanol synthesis process operates in a stable, high-throughput manner and demands low carbon dioxide/carbon monoxide ratios in feed. The current project, nonetheless, is to encompass fle...
Read Project

 8

 FINISHED 
The main objective of the NanoDome project is to develop a robust model-based design and engineering toolkit for the detailed prediction of complex nanomaterial structures produced in a commercially-relevant generic bottom-up Gas-Phase (GP) synthesis process, to improve the control of the nanomaterial production and the industrially-scalable GP synthesis process for more accurate final product pro...
Read Project

 6

 FINISHED 
The main objective of the presented innovation action is the first application and near-market replication of a novel water nanogeotechnology for the immobilization of toxic metals in groundwater aquifers, drinking water wells, and river bank filtration sites. The basic concept of our technology is the creation of an adsorptive in situ barrier for the immobilization of toxic metal contaminations. ...
Read Project

 8

 FINISHED 

The supercritical CO2 Heat Removal System (sCO2-HeRo)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

"Raising nuclear reactor safety to a higher level - The supercritical CO2 heat removal system - "sCO2-HeRo"The “supercritical CO2 heat removal system”, sCO2-HeRo, safely, reliably and efficiently removes residual heat from nuclear fuel without the requirement of external power sources. This system therefore can be considered as an excellent backup cooling system for the reactor core or the spent f...
Read Project

 6

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Polycyclic aromatic hydrocarbons (PAHs) are widely distributed contaminants that produce hazardous effects on human health. They are persistent in the environment and recalcitrant to degradation, rendering the development of efficient PAH-removal methods a worldwide concern. In PAH-contaminated aquifers or sediments, oxygen is depleted very rapidly, thus microorganisms able to use these compounds ...
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The limited capacity of electric batteries combined with the substantial amount of energy needed to run auxiliary equipment dramatically affects range capability of electric vehicles (EVs). For instance, the climate control system in summer conditions can absorbs up to 40-60% of the available energy.The aim of the project is to develop an energy friendly climate control system capable to reduce of...
Read Project

 8

 FINISHED 
Against the background of increasing labour market insecurities among youth during the recent crisis, the aim of this interdisciplinary and internationally comparative project is to provide a comprehensive understanding of the consequences of youth labour market vulnerability for risks of social exclusion in Europe. A multidimensional dynamic perspective on both objective and subjective dimensions...
Read Project

 10

 FINISHED 

Imaging Magnetism in Nanostructures using Electron Holography (IMAGINE)

Start date: Apr 1, 2013, End date: Mar 31, 2018,

"Future developments in the control, functionalization and manipulation of magnetic nanoparticles and nanoscale magnetic devices require an understanding of collinear and non-collinear spin configurations and correlated changes of electronic structure on the sub-nanometer scale.In this project, an experimental methodology will be developed to allow magnetic spin structures in differently shaped na...
Read Project

 3

 FINISHED 

Quality of Jobs and Innovation Generated Employment Outcomes (QuInnE)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

The EU is facing long-term structural challenges compounded by the recent economic crisis. More and better jobs are needed to lower unemployment, raise the employment participation rates of female, older, migrant, low-skilled and young workers and thus tackle social exclusion and inequality. The EU’s growth strategy, Europe 2020, wants smart, sustainable and inclusive growth, with innovation and j...
Read Project

 9

 FINISHED 
"MARS will support managers and policy makers in the practical implementation of the WFD, of related legislation and of the Blueprint to Safeguard Europe’s Water Resources by conducting new research and synthesising existing knowledge concerning effects and management of multiple stressors in surface water and groundwater bodies; by advising the 3rd RMBP cycle and the revision of the WFD; and by d...
Read Project

 25

 FINISHED 

European Lead Factory (EUC²LID)

Start date: Jan 1, 2013, End date: Dec 31, 2017,

The European Lead Factory concept proposed by the EUC2LID Consortium relates to the discovery of novel small molecule candidates to serve as starting points for subsequent optimization to either drug candidates or high-quality pharmacological tools for the experimental validation of targets. The concept intends to bridge academic and applied research interests. The European Lead Factory will provi...
Read Project

 34

 FINISHED 
The main objectives of DESSIN are- To demonstrate and promote innovative solutions to water-related challenges with a focus on: (i) water quality issues related to the implementation of the Water Framework Directive (WFD) and (ii) water scarcity.- To demonstrate a methodology for the valuation of ecosystem services (ESS) as catalyser for innovation in water management.DESSIN will launch demonstrat...
Read Project

 21

 FINISHED 
The exponential growth of mobile traffic, drastically increasing of network complexity, and the strong need for inter-network coordination of wireless network resources call for breakthroughs in control, coordination and flexible spectrum management in 5G heterogeneous radio access networks. The COHERENT project aims to address these problems by researching, developing and validating a novel cont...
Read Project

 14

 FINISHED 

Digital skills and tools for Young Female Entrepreneurs

Start date: Oct 1, 2014, End date: Sep 30, 2017,

The PROJECT contributes to the efforts for reduction of youth unemployment specially among women and for recognition and certification of skills developed in environments of non -formal and informal training/education that can be adapted to different work needs and environments. Through the production of a structured product Digi Fem accompanied by MOOC courses, women will be enhanced to start up...
Read Project

 8

 FINISHED 
In RAPID, we propose to use a centralized radio access (C-RAN) architecture to support high-capacity heterogeneous (3g, 4G and 60 GHz) radio access technologies through low-cost, but ultra-high-bandwidth photonic techniques for the fibre distribution. To meet the requirement to transport the high-frequency (and wide-bandwidth) wireless signals at low-cost, a novel coherent radio-over-fiber (CRoF) ...
Read Project

 5

 FINISHED 

New Materials for High Moment Poles and Shields (NU-MATHIMO)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

"The ever-expanding demand of the world market leads to magnetic recording data storage devices advancing toward much smaller dimensions and higher storage capacities. In order to achieve capacities beyond 2TB/in2 next generation magnetic recording head transducers will require improved high moment magnetic material together with novel write pole and shield structures to preserve the necessary mag...
Read Project

 3

 FINISHED 

Enterprise+ Innovative Potential Meets Experience

Start date: Sep 1, 2014, End date: Aug 31, 2017,

In view of the fact that youth unemployment is high in the EU, the planned project aims at promoting the consideration of self-employment in vocational education. Therefore, the objective is to benefit from the emerging synergy effects of the cooperation between youth and (ex-) managers from the age group 55+ in entrepreneurship projects. For this purpose an analysis of the potentials in terms of...
Read Project

 9

 FINISHED 
The ‘Europe Engage’ Project seeks to embed the concept and practice of the civic university through service-learning and student engagement with community. The overall aim of ‘Europe Engage’ will be to promote Service-Learning as an innovative pedagogical approach that embeds and develops civic engagement within higher education, students, staff and the wider community. Europe Engage will sup...
Read Project

 12

 FINISHED 
"Power system reliability management means to take decisions under increasing uncertainty (for instance, related to renewable generation). It aims to maintain power system performance at a desired level, while minimizing the socio-economic costs of keeping the power system at that performance level. Seven TSOs (Belgium, Bulgaria, Czech Republic, Denmark, France, Iceland, Norway), together with ele...
Read Project

 20

 FINISHED 
Early cancer diagnosis greatly increases the chances for successful treatment and personalised therapy. RNA molecules have emerged as new candidate biomarkers for detecting a wide variety of cancers, due to their critical role in cell growth and development. In situ hybridization techniques for mRNA detection provide detailed spatial and temporal information on RNA expression with single-molecule ...
Read Project

 1

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
"The ATBEST ITN will develop innovative research and training for the biogas industry in Europe. It comprises eight training sites located in the UK, Ireland, Germany and Sweden and is a multidisciplinary collaboration between internationally-renowned research teams and industrial partners, each with complementary expertise in a wide range of environmental technologies. 12 ESRs and 2 ERs will be r...
Read Project

 8

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: May 31, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1