Search for European Projects

27 European Projects Found

Searched on 125080 European Projects

 FINISHED 
After decades of truly transformative advancements in single molecule (bio)physics and surface science, it is still no more than a vision to predict and control macroscopic phenomena such as adhesion or electrochemical reaction rates at solid/liquid interfaces based on well-characterized single molecular interactions. How exactly do inherently dynamic and simultaneous interactions of a countless n...
Read Project

 1

 FINISHED 
Unlike China, Russia or South Africa, the EU-28 Member States are not in the fortunate position of having vast, easily accessible ore deposits containing valuable metals. However, Europe does have large quantities of secondary industrial residues (tailings, sludges, slags and ashes) that contain sig¬nificant concentrations of both critical and economically important metals. The Euro¬pean Training ...
Read Project

 8

 FINISHED 
Flintstone2020 aims to provide a perspective for the replacement of two important CRMs – tungsten (W) and cobalt (Co) – which are the main constituents for two important classes of hard materials (cemented carbides/WC-Co, and PCD/diamond-Co), by developing innovative alternative solutions for tooling operating under extreme conditions. Fundamental knowledge on mechanical properties and wear of dif...
Read Project

 9

 FINISHED 
The overall aim of Real-Time-Mining is to develop a real-time framework to decrease environmental impact and increase resource efficiency in the European raw material extraction industry. The key concept of the proposed research promotes the change in paradigm from discontinuous intermittent process monitoring to a continuous process and quality management system in highly selective mining operati...
Read Project

 14

 FINISHED 

DEFect NETwork materials science and engineering (DEFNET)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

Porous coordination network materials, also known as Metal-organic Frameworks (MOFs), are at the cutting edge of molecular materials science. DEFNET, “DEFect NETwork materials science and engineering”, is the first European Training Network (ETN) at the intersection of chemistry, physics and engineering aimed at structural and functional complexity of MOFs. It provides a unique interdisciplinary t...
Read Project

 11

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Drilling in supercritical geothermal condition (DESCRAMBLE)

Start date: May 1, 2015, End date: Apr 30, 2018,

"The aim of the "Drilling in dEep, Super-CRitical AMBients of continentaL Europe: DESCRAMBLE" project is to develop novel drilling technologies for a proof-of-concept test of reaching deep geothermal resources and to contribute to a low-carbon European society. To achieve this target the first drilling in the world in an intra-continental site at a middle-crustal level will be performed. The test ...
Read Project

 7

 FINISHED 
Earth provides natural resources, such as fossil fuels and minerals, that are vital for Europe´s economy. As the global demand grows, especially for strategic metals, commodity prices rapidly rise and there is an identifiable risk of an increasing supply shortage of some metals, including those identified as critical to Europe's high technology sector. Hence a major element in any economy’s long-t...
Read Project

 21

 FINISHED 
BioMOre describes a “New Mining Concept for Extracting Metals from Deep Ore Deposits using Biotechnology”. The concept is to use hydrofracturing for stimulation and bioleaching for winning of ores. The final process will consist of a so-called doublet, which is two deviated and parallel wells.In order to avoid high costs for drilling from the surface, the BioMOre approach is divided into two phase...
Read Project

 25

 FINISHED 
Modern economy is highly dependent on specific raw materials, and it is envisaged that this dependency will increase in the near future. Most of them are scarce in EU and of poor purity, being mixed within complex and low grade aggregates which need to be processed by means of a separation process consuming high quantities of energy and water, and even in some cases this makes its exploitation unf...
Read Project

 8

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: May 31, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
In the BioROBUR project a robust and efficient fuel processor for the direct reforming of biogas will be developed and tested at a scale equivalent to 50 Nm3/h production of PEM-grade hydrogen to demonstrate the achievement of all the call mandates. The system energy efficiency of biogas conversion into hydrogen will be 65%, for a reference biogas composition of 60%vol CH4 and 40%vol CO2.Key innov...
Read Project

 9

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: May 31, 2016,

Im ersten Projektjahr der neuen ERASMUS+-Generation führten wir an der TU Bergakademie Freiberg Erasmus+-Mobilitäten in den Schienen Studierendenmobilitäten (Studium und Praktikum) und Personalmobilitäten (Lehre und Weiterbildung) durch. Ziel war es dabei u. a. unseren Studierenden eine längere internationale Erfahrung zu ermöglichen und sie auf den immer mehr globalisierten Arbeitsmarkt vorzubere...
Read Project

 1

 FINISHED 

PEL-SKIN: A novel kind of surface coatings in aeronautics (PEL-SKIN)

Start date: Jun 1, 2013, End date: Nov 30, 2015,

"The PEL-SKIN project aims to deliver a novel airfoil coating to improve the global aerodynamic performance and manoeuvrability of future air transport. We propose to investigate drag reduction from a prefabricated coating composed of a densely packed arrangement of flexible fibres that can be attached directly onto a wing or aerodynamic surface, in the region of separated flow.Inspired by the ‘po...
Read Project

 6

 FINISHED 
The overall scope of the DAPhNE project is to develop and demonstrate a package of integrated solutions for energy intensive processes (ceramics, cement and glass), based on tuning micro-wave technologies to the material characteristics and on intelligent control systems, to provide real time information about the energy consumption as well as the product quality.Microwave heating is now a well e...
Read Project

 18

 FINISHED 

NEW BIOCOATING FOR CORROSION INHIBITION IN METAL SURFACES (BIOCORIN)

Start date: Mar 1, 2012, End date: Aug 31, 2015,

The annual direct cost of corrosion estimated worldwide exceeds €1.32 trillion, which means approximately between 3 to 4% of the Gross Domestic Product (GDP) of industrialized countries. Among the different types of corrosion Microbial Influenced Corrosion (MIC) caused by fouling is estimated to be involved in at least 10% of the corrosion problems of structures reaching to 50% in the case of subt...
Read Project

 10

 FINISHED 
The aim of CHANGEHABITATS 2 is the initiation of a long lasting intersectoral and international network in the field of environmental monitoring between industry and academia. Its aim is to develop operable, time and cost effective procedures, and (software) solutions for monitoring habitats using innovative airborne data acquisition techniques. Within the project two complementary data acquisitio...
Read Project

 8

 FINISHED 
The overall objective of the FC-DISTRICT project is to optimize and implement an innovative energy production and distribution concept for sustainable and energy efficient refurbished and/or new “energy autonomous” districts exploiting decentralized co-generation coupled with optimized building and district heat storage and distribution network. The concept is based on dynamic heat exchange betwee...
Read Project

 23

 FINISHED 
Biotechnologically derived substances for large scale feed, food and pharma applications represent one of the most important sources of new products due to their precisely controlled structural and functional properties, potential for economic and responsible production and overall broad benefits to society through biocompatibility and sustainability. The costs of producing biomaterials are in man...
Read Project

 16

 FINISHED 

Nano-particle products from new mineral resources in Europe (PROMINE)

Start date: May 1, 2009, End date: Apr 30, 2013,

The objectives of the ProMine IP address the Commission’s concerns over the annual 11 billion € trade deficit in metal and mineral imports. Europe has to enhance the efficiency of its overall production chain putting higher quality and added value products on the market. ProMine focuses on two parts of this chain, targeting extractive and end-user industries. Upstream, the first ever Pan-EU GIS b...
Read Project

 33

 FINISHED 

Ceramic Heat exchangers with enhanced materials properties (CEREXPRO)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

"Heat recovery at a high temperature level is essential in industrial thermal processing. The use of ceramic materials yields higher temperatures and subsequently a higher efficiency. The present project aims to develop a new generation of ceramic heat exchangers for high temperature heat recovery with the target of significantly reducing the size and weight as well as also the price of such comp...
Read Project

 8

 FINISHED 
Low temperature heat recovery is often limiting the energy efficiency of industrial processes. Low temperature differences imply large exchange surfaces which are unfeasible from the economic (expensive metal are needed to withstand the presence of condensates) and technical (too large volumes for the specific application contexts) viewpoints. The present project aims at developing nanofilled-poly...
Read Project

 10

 FINISHED 
"Within the context of the GMES Initiative, the G-MOSAIC Collaborative Project aims at identifying and developing products, methodologies and pilot services for the provision of geo-spatial information in support to EU external relations policies and at contributing to define and demonstrate sustainability of GMES global security perspective. The activities will be devoted to: Investigate the oper...
Read Project

 39

 FINISHED 

Gigascale Oriented Solid State flAsh Memory for EuRope (GOSSAMER)

Start date: Jan 1, 2008, End date: Jun 30, 2011,

Description GOSSAMER successfully developed a fully integrated Flash NAND technology based on the TANOS concept, investigating a large number of architecture and material options. The project aimed at the development of the technology for very high density Non Volatile Memories for mass storage ap...
Read Project

 21

 FINISHED 
The project will create and maintain a virtual e-learning centre for vocational education in natural gas engineering. The virtual centre will target training at gas industry engineers and will involve co-operation between university and industrial partners across Europe, in an effort to develop a comprehensive network able to support and maintain an up-to-date e-learning platform. At the start of ...
Read Project

 8